Construction begins on UCLan's £30m engineering centre

By Lancashire Business View

14 Jul 2017

The first phase of construction at the the University of Central Lancashire’s £30m-plus Engineering Innovation Centre has begun.

The state-of-the art facility, a major milestone within UCLan's £200m Campus Masterplan, is anticipated to produce an increase of 500 locally trained graduates per year in areas including aerospace, mechanical and energy technologies and engineering.

Staff, students, and companies within the region will have access to top of the range equipment including flight simulators, Formula One cars and specialist electronic labs, which will allow students to work on live, real world projects.

Manchester-based BAM Construction is on site delivering the scheme, which is due for completion in 2019.

Piling activities to form part of the foundations for the six-storey building have commenced, with a large piling rig now on site drilling 600mm diameter holes that are 25 meters long and filled with concrete and steel.

Once the foundations are complete, work will begin on the retaining wall and concrete cores of the building before starting the steel frame.

Michael Ahern, chief operating officer at UCLan, said: “The start of work on site marks another exciting milestone for our Campus Masterplan and the creation of a powerful hub for developing and nurturing skills.

“The EIC will address the skills deficit in engineering specialists in Lancashire and nationally. A skilled engineering workforce is essential for the economy and the benefit of wider society.

“It has an important part to play, not just in confirming Lancashire’s role as a national centre for advanced manufacturing, but in maintaining the UK’s international leadership in engineering and innovation.”

 

The EIC is an integrated teaching and research space which will deliver a range of key objectives, including ensuring that local skills reflect social and economic needs and increasing the number of females in engineering careers. Identified as a signature project within Lancashire’s Strategic Economic Plan, the EIC has secured £10.5m via the Lancashire Enterprise Partnerships’ Growth Deal with the government. The new facility has also received £5.8m from the European Regional Development Fund (ERDF) and £5m from HEFCE’s STEM Capital Fund.

Latest news

1

Architectural designer becomes youngest Civic Trust chair Nixie Edwards

Architectural designer becomes youngest Civic Trust chair

06 Nov 2026

2

Carousel tax fraudster loses £90m court appeal Arif Umarji Patel The Seized Ferrari Counterfeit Underwear Container With Counterfeit Clothes Inside 002

Carousel tax fraudster loses £90m court appeal

05 Nov 2026

3

Combined authority takes control of £45m adult skills fund Welding Bootcamp Learners In A Practical Lesson At Lancaster And Morecambe College

Combined authority takes control of £45m adult skills fund

05 Nov 2026

4

Legal View: Finding the right separation route Amy Harris Feat Img

Legal View: Finding the right separation route

05 Nov 2026

5

Panache Cruises in triple appointment Panachecruises

Panache Cruises in triple appointment

05 Nov 2026

Background image for hub sign up block

LBV Hub

Leverage Lancashire Business View platforms

Post your news
Post your events
Post your offers
Build your network
Improve your SEO
Gain coverage in the magazine
Sign-up
Events
LBV131 November/December Magazine Networking Event
LBV131 Magazine Launch Social720No Text 19 Nov 2026

LBV131 November/December Magazine Networking Event

The Landmark, School Lane, Burnley, BB11 1UF

08:30 - 10:30

Lancashire Business Day 2026
LBD26 WW Logo720 27 Nov 2026

Lancashire Business Day 2026

Burnley Football Club, BB10 4BX

12:00 - 17:00

Sub36 Reunion & Networking
03 Dec 2026

Sub36 Reunion & Networking

Burnley Football Club, BB10 4BX

15:00 - 17:00

Lancashire Net Zero Conference 2027
NZC27 Social 1200x800Generic 1 11 Feb 2027

Lancashire Net Zero Conference 2027

The Wellbeing Farm, Edgworth, Wheatsheaf Hill Farm, Plantation Road, BL7 0BY

09:30 - 02:00

Help to Grow: Management Course
Help To Grow 25 Sep 2026 - 15 Dec 2026

Help to Grow: Management Course

University of Lancashire, Preston, PR1 2HE

09:30 - 12:00

National Minimum Wage (NMW) and National Living Wage (NLW) Compliance
Untitled design (11).png.png 10 Nov 2026

National Minimum Wage (NMW) and National Living Wage (NLW) Compliance

Online - Microsoft Teams

11:00 - 11:45

Immigration changes on the horizon - what HR teams need to know
Immigration webinar.png.png 10 Nov 2026

Immigration changes on the horizon - what HR teams need to know

Online, via Microsoft Teams

12:00 - 12:45

Preston Tech Connection: People Behind The Ideas
11 Nov 2026

Preston Tech Connection: People Behind The Ideas

Society1, Coworking Space, Preston, PR1 3LT

18:00 - 19:03

The Business Network Central and East Lancashire
12 Nov 2026

The Business Network Central and East Lancashire

Longridge House, Preston, PR3 2TB

11:30 - 14:15

Ai in business: protect, innovate & grow
Door4 Forbes 12 Nov 2026

Ai in business: protect, innovate & grow

Brockholes Nature Reserve, Preston, PR5 0AG

09:00 - 12:00

Napthens' Cumbria Clay Shoot - for Penny Conservation Charity
N123_1200x400px_Title&Subtitle (1).png.png 12 Nov 2026

Napthens' Cumbria Clay Shoot - for Penny Conservation Charity

Leighton Hall Estate Storrs Lane, Carnforth, LA5 9ST

09:00 - 16:00

Lancaster District Business Support Expo
Lancaster And Morecambe Logo 1 18 Nov 2026

Lancaster District Business Support Expo

The Platform, Morecambe, LA4 4DB

09:00 - 13:00

Advertise with us

Reaching 50,000 members, our print, digital and event platforms offer a fantastic way to raise your business profile and help you grow.

Find out more LBV130 Online GraphicWebsite
Subscribe now

Weekly news bulletin